Mynydd-y-Gwair Wind Farm Objection Form


Objecting to Mynydd-y-Gwair wind farm will take no more than a few minutes. Simply add your personal details, leave the box containing the planning application details as it is, click any of the boxes opposite the paragraphs you wish to include in your objection and then press the send button at the bottom of the page. Personal objections in your own words are even better and you will find a section for these near the bottom of the page.
PLEASE CHECK THAT YOUR OBJECTION APPEARS IN YOUR SENT MAIL FOLDER IF YOU TRY TO USE THE FORM BELOW (there's a chance that the security settings on your computer might block this website from transferring information to you).
As an alternative you can email the planners directly at David.Owen@swansea.gov.uk or download our standard objection letter, which can be sent by post.
| click here for objection letter |

Please remember all members of a household can object
Your Name
House, Street
Town, County, Country
Postcode or Zip
Your email address
Date

Please click any of the boxes to include the section in your objection
On Landscape grounds:
Threat to open access nature of the common.
Negative cumulative impact on the landscape, especially as turbines are already present at Ffynnon Oer, and consented/being erected on Mynydd Betws.
On grounds of Recreation and Enjoyment:
Disruption, risk of injury, and threat to their recreational enjoyment for members of the public using this open access common, including ramblers and balloonists. Horse riders and cyclists use the road that passes through the common, and their enjoyment of it is also under threat.
Damage to tourism in the immediate area e.g., Ramblers, bird watchers, visual impact from the existing Gower AONB and the Brecon Beacons National Park.
Unacceptable increase in traffic during construction, maintenance and decommissioning of turbines.
On Safety grounds:
Proximity of turbines to roads (e.g. Risk of driver distraction).
Safety concerns, e.g. ice fall from blades and risk of fire in the event of lightning strikes. The former could lead to road closures/injury, the latter is a particular concern owing to the presence of both grassland and peat; if a fire takes hold it could burn for weeks and spread over a very large area.
On grounds of Economic Impact:
Infrastructure concerns, e.g. concerning large loads, negative impacts on roads, access to hospitals, schools etc.
Multiple risks to the local economy.
Ecology.
Damage to and disturbance of peat, that locks down carbon, and which makes this an irrational location to site wind turbines.
Damage to and disturbance of blanket bog, a priority habitat under both the UK and Local Biodiversity Action Plan.
Reinstatement would not be complete/adequate. Turbine foundations, etc, are left in place even if turbines are decommissioned, and peat takes an exceedingly long time to form.
Risk of landslips, owing to former mining activity in the area, and changes to the hydrology of the area if construction were to occur.
Hydrology issues/negative impacts on the catchment area for the Upper Lliw Reservoir and damage to source of two rivers. Damage to springs that Farms and dwellings rely heavily on.
Risks to many species protected by European and other laws, including otter, red kite, skylarks, golden plover and several species of bats.
On grounds of Commoners' Issues:
Threat to commoners livelihoods and way of life, e.g. owing to disruption of hefted flocks.
Threat to livestock/animal welfare issues.
Risks associated with a change of permitted land use for the site to general industrial use, e.g. future uses (post turbines) of the land.
Threat of joy riders accessing wind farm tracks.
Additional Personal Objections: